Start your plan

How to draw a site plan for a Toronto permit.

A site plan is a to-scale drawing of your lot seen from above: the lot lines with their lengths, the buildings already there, the new shed, deck or garage with its size, and the distance from it to every lot line and building. Here is how to draw one, step by step, from what the City’s permit guides ask for.

From the City of Toronto’s permit guides as of November 2, 2026.

Before you start

Step by step

  1. 1. Pick a scale and a sheet

    Use a metric scale that fits a standard sheet. At 1:250 a 37 m deep lot is 148 mm long, so a typical Toronto house lot fits on letter paper. Add a scale bar and a north arrow.

  2. 2. Draw the lot lines

    Copy each lot line and its length from your survey, and write the lot area. Copy any easement or right-of-way from the survey too.

  3. 3. Draw what is already there

    The house, a garage, other sheds or decks, each with its overall size.

  4. 4. Draw the new structure

    Its outline to scale, labelled with its width, depth and height.

  5. 5. Measure the setbacks

    From each side of the new structure to each lot line, and to the nearest building on the lot. These are the numbers the zoning review checks first.

  6. 6. Fill in the zoning summary

    Permitted and proposed, side by side: lot area, building area (gross floor area), lot coverage, and grade elevations to confirm the height. The permitted numbers come from Zoning By-law 569-2013 for your zone; the shed and garage rules and the deck rules have them for the common cases.

  7. 7. Add the driveway, parking and landscaping

    Dimensioned parking areas and driveways, paved areas, lawn and planting.

  8. 8. Sign, date and send

    Sign and date the sheet and save it as a PDF, with no personal information such as your name or phone number on it. Apply online through Toronto Building’s portal. An attached garage or carport goes by email instead (see the Garages and Carports guide).

Or start from your address

lotmara draws the lot, the buildings already there, your new structure, every setback and the driveway to scale from City of Toronto open data. You check each lot line against your survey, and add easements, grade elevations and landscaping by hand. You see a free preview before you pay.

Make your site plan from your address

The checklist marks each City item as on the PDF, partly on it, or yours to add.

Sources

lotmara isn’t made by or connected to the City of Toronto. Rules change: check the source before you build.